Scenery Articles

These are articals that relate to adding scenery to the layout.


04-11-08 Change of Scenery

The first change of scenery is the website itself. I installed a new content management system to fix a few things that I did not like about the previous one I was using. The original content is still here. I have added a feature to the Expansion section that will group the articles by the type of work.

The second change of scenery is on the layout. I decided to take a break from model building and work on some scenery. I started work on the mountain ridge that will span the two modules between the Ntrak module and the yard module.

Read more

06-07-08 Plastered

I have added a layer of plaster to the mountain ridge.

Read more

06-14-08 Tunnel Portal

Before I could continue the scenery on the mountain ridge, I had to install the tunnel portal.

Read more

06-29-08 Creating A Seam

I had to deal with the seam where the removable mountain ridge meets the plywood.

Read more

07-20-08 Rock Wall

I had to add a rock wall where the track cuts through the ridge.

Read more

08-03-08 Smoothing the Ridge

I had to smooth out the depressions the plaster cloth formed when it was draped over the cardboard structure on the mountain ridge.

Read more

08-23-08 Engine House Foundation

Now that the engine house is constructed, I could build its foundation.

Read more

08-30-08 Ground Work

I constructed the rest of the ground around the engine house and the front of the module.

Read more

09-14-08 Mini Ridge

I worked on the ridge that will sit in front of the track forming the opposite side of the rock cut.

Read more

09-28-08 Rocks and Undercoat

Before I could apply a basic ground color, I decided to add some rock outcroppings

Read more

10-26-08 Ground Covering

After many delays, I was able to add ground cover on the mountain ridge and the surrounding area.

Read more

11-16-08 Ballast

I ballasted the track on the end loop module that I have been working on.

Read more

06-07-09 Photo Update

I have updated the photos in the Gallery showing the overall layout at this point in construction.

Read more

06-27-10 Corner Module Scenery

I worked on the scenery on the corner module that sits between the original NTrak module and the end loop module containing the mountain ridge and engine house.

Read more

07-25-10 Foundations and Roads Part 1

I have started working on the foundations and roads for the brewery complex. The first up is the warehouse.

Read more

08-14-10 Foundations and Roads Part 2

I constructed the foundation and road for the mill in the brewery complex.

Read more

09-06-10 Foundations and Roads Part 3

I started to work on the foundations and roads for brewery buildings on the backside of the tracks.

Read more

10-02-10 Foundations and Roads Part 4

I worked on the surfaces around the cellar in the brewery complex.

Read more

10-28-10 Foundations and Roads Part 5

I added the foundation and roads around the brew house.

Read more

11-20-10 Foundations and Roads Part 6

I created the road that connects the back half of the brewery complex to the front.

Read more

12-04-10 Bridge Under The Tracks

The pedestrian bridge I planed to build went an entirely different direction.

Read more

12-24-10 Foundations and Roads Part 7

I painted all the concrete surfaces in the brewery complex.

Read more

01-08-11 Foundations and Roads Part 8

I completed the work on the sidewalks, roads, and foundations.

Read more

01-30-11 Photo Update

I have updated the photos in the Gallery showing the overall layout at this point in construction.

Read more

02-26-11 Going Vertical Again

I started to work on the second mountain ridge on the layout. The ridge runs along the back of the brewery complex. It will help conceal the track end loop. I am designing it to be removable like the first mountain ridge.

Read more

03-19-11 Ridge Framing

I started working on the ridge structure that will eventually support the ground surface.

Read more

04-09-11 Ridge Framing Continued

I continued installing the vertical supports on the mountain ridge located behind the brewery complex.

Read more

04-23-11 Ridge Lattice

I laid down a cardboard lattice on the ridge surface.

Read more

05-14-11 Plastered Again

I placed plaster cloth on the ridge that will sit behind the brewery.

Read more

06-12-11 Ridge Smoothing

I worked on smoothing the ridge surface.

Read more

07-03-11 Blending In

I blended the removable ridge into the layout.

Read more

07-16-11 Ground Prep

I worked on preparing the ground around the brewery complex for Sculptamold

Read more

08-06-11 Ground Work

I filled in the rest of the areas around the brewery complex with Sculptamold.

Read more

08-21-11 Ground Undercoat

I painted the ground surfaces with an earth colored undercoat. This will show through any areas not covered with ground foam.

Read more

09-24-11 Ridge Ground Cover

I added various ground coverings to the mountain ridge that sits behind the brewery complex.

Read more

10-15-11 Brewery Scenery

I added scenery around the brewery complex.

Read more

11-26-11 Corner Module 2 Scenery

I worked on the scenery on the module that sits between the brewery complex module and the original NTRAK module.

Read more

01-21-12 Not So Shady Creek

I rehabbed the rest of the original NTRAK module.

Read more

03-31-12 Photo Update

I have updated the photos in the Gallery showing the overall layout at this point in construction.

Read more

07-08-12 Building Trees

Over the last few months I have been slowly working on trees to plant on the layout.

Read more

08-15-12 Tree Planting

I planted most of trees that I reconditioned or built.

Read more

11-03-12 More Trees

Work on the layout has been slow over the last few months. I did make a new batch of trees and planted them.

Read more

12-15-13 Photo Update

I have updated the photos in the Gallery showing the current layout.

Read more



• Scenery Articles